Utility Scale Solar Projects
- JSR GROUP has the expertise and know – how to obtain necessary licenses, permissions and other government documentation, making sure rules and local codes are carefully maintained and that construction work is complete within the promised time frame.
- We ensure to optimize your resource to its fullest by providing design and engineering skills. With clearly defined parameters from the client, we are equipped to handle any scale of solar projects from design development to turn-key EPC to project completion.
- We looks into the finer nuances of each project, especially timely execution, quality control and reducing minor complications that may arise on the field.
- With our highly competent team, we provide a suitable and co-operative environment to work in unison with your in-house professionals. We help in sourcing and procuring the highest quality components that harmonize our superior design, ensuring optimum energy output.
- Machinery:-For the keen focus of delivering the project on time, we have keenly focused on integrating all the associated Machinery & Resources both in house & from the pooled resources available in the market with no delay.
Design & Engineering
Determine power consumption demands. The first step in designing a solar PV system is to find out the total power and energy consumption of all loads that need to be supplied by the solar PV system
Procurement
- Procurement of Module Mounting Structure & Single Axis Tracking System & Associated Hardware.
- Procurement of all major Electrical items i.e Switchgears, Control Panel, ACDB/DCDB, CT/PT, LT/HT Panel etc
- Procurement of Material required for construction of Pile Foundation, Boundry Wall, ICR, MCR Drainage System etc.
Construction
- Site Levelling and Grading
- Bore well
- Drainage System
- Foundation of MMS pile
- Inverter Control Room//Main Control Room
- Internal and Peripheral Roads
- Boundary wall
- Rain Harvesting
Services (AC/DC Installation)
- DC/AC Cable lying
- Inverter room [LT PANNEL / Aux Pan]
- Peripheral Lighting Erection
- AC EQUIPMENT INSTALLATION except C&R Panel
- Auxiliary Transformer – 5 & RMU -4 DCD
- LA Foundation + LA Earth Pit + LA Installation
- Plant Earthing
- AC / HT / OFC / Communication Cable lying
OFFER ACROSS THE VALUE CHAIN